stratego
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nyx/public_html/wp-includes/functions.php on line 6121NYX Consultancy provided comprehensive BIM support to Future Glazing for the Guggenheim Museum project. They generated detailed BIM drawings and models, ensuring accurate representation of the glazing systems. Their engineering expertise facilitated structural integrity and performance analysis, while precise costing estimations aided budget management. Nyx produced fabrication drawings, streamlining manufacturing processes. Crucially, they managed BIM coordination, resolving clashes and ensuring seamless integration with other disciplines. Their meticulous approach to model submission and adherence to project specifications guaranteed efficient execution and high-quality outcomes for the complex glazing elements of the Guggenheim Museum.<\/p>\n","protected":false},"author":1,"featured_media":8497,"comment_status":"closed","ping_status":"closed","template":"","cpt_portfolio_group":[98],"class_list":["post-945","cpt_portfolio","type-cpt_portfolio","status-publish","has-post-thumbnail","hentry","cpt_portfolio_group-projects"],"yoast_head":"\n